You will discover in this tutorial the installation recommendations, as well as the steps to follow to properly install a TEHA engine on your portal. |
The TEHA engine is able to operate a gate composed of one or two beats, the maximum length of which does not exceed 1.75 m, in the case of a light and perforated gate. In case of a semi-yloid and heavy gate, the size of the be smaller.
The beats can be asymmetrical (of different size) as long as the largest of the boasts does not exceed the limit size supported by the engine.
It is not recommended to install this engine on a full gate.
The gate must be equipped with a reinforcing point, on which the motorization will cling.
The portal must be stable and balanced (do not open or close alone without external action).
The portal must open and close in a flat manner.
The portal must open towards the inside of the property, for its two beats.
Its maximum aperture angle should not be less than 60°.
The pillar must have a sufficient size to properly accommodate the fastening tab of the engine.
The pillar should not be rounded on the face receiving the fixing tab of the motorization.
The materialized distance B will depend on distance D (see Table Step 1 Measurement on the pillar).
You will find in the image the minimum and maximum distances to which the tab can be fixed (with D=0 cm and D=15 cm).
The pillar must be clean and dry and free of possible fasteners of an old engine model.
It is imperative to have a lateral safety clearance between the open portal and any fixed part of the environment.
The ground must be straight and regular. The portal should not rub against the ground.
The engine is not compatible with sloping, up or downward inputs.
The installation of ground abutmentFixesandPermanentesisObligatoryin opening and closing.
The depth of installation of the portal compared to the internal face of the pillar is important. We call it distance D.
This cannot be less than 0 cm (negative distance) and cannot exceed 15 cm.
On this distance will depend on the installation distance B of the tab on the pillar (see prerequisites of the pillar).
If you have the option to adjust the installation depth of the portal, take care to choose a location that allows you to have a distance B compatible with the width of your pillar.
In case of distance D negative or greater than 15 cm, it will be necessary to change your pillar.
In the closed position, the gate must be parallel to the rear face of the pillar on which the pillar fixing tab will be installed.
It is strictly forbidden to install the cylinders on the outer side of the gate (street side).
It is strictly forbidden to install engines more than 1.50 m high.
It is strictly forbidden to install the electronic box on a mobile part of the portal.
It is not possible to install the pillar fixing tab on a enclosure wall perpendicular to the gate.
It is not possible to install the pillar fixing tab on the same face as the gate gonds.
It is not possible to install the jacks on an unarmed part of the portal.
If the size of your pillars does not allow you to respect distance B, it will not be possible to install the engine.
A gate motorization is installed according to well-defined mounting distances, allowing it optimal and secure operation.
If the engines are not installed according to the data in the table below, your engine may:
- Not to properly train the beaters (low opening angle, obstacle detections recorded by the map, erratic operation, etc.),
- not to keep the beats closed correctly,
- destruction of one or more constituent elements of the engine
- not to comply with the values defined by standard NF-EN 12453 and to cause significant material or bodily damage.
Any non-compliant installation resulting in malfunction, destruction or premature wear of the appliance may not be supported under the warranty.
No technical assistance will be provided by Avidsen until the installation of the engine is brought into compliance.
Measure distance D (see Prerequisites installation of the portal on the pillar).
Refer to the table to know the distance B (distance between the middle of the fixing tab and the gonds) (See Pillar prerequisites).
Assemble the two elements of the fixing tab. The point of attachment of the jack to these tabs shall be 31 mm above the middle of the reinforcing point of the gate.
Make sure the level of the paw and mark the location of the holes to be drilled.
Mark the location of the holes in the pillar by ensuring that the pillar fixing tab is mounted well horizontally at the end. Use shooters of 10 or any other fastening system suitable for the pillar material.
Be careful, the forces on the fixing tab will be significant when the motorization is running. We recommend sealing threaded rods with a length of at least 15 cm. If the pillar is made of metal, we recommend welding or passing through the threaded rods to fix them with self-locking nuts.
Consult a professional in case of doubt.
1) Position the rear fork of the jack on the tab, in position the washers above and below the tab
2) Insert the stud
3) Lock with pin
Return the jack and make sure that the trolle is about 5 mm from the inner end of travel of the jack. Otherwise, move the carriage using a 9V LR61 battery. It is also possible to connect the motors to the electronic card (see connection chapter) and launch manual mode to power the motors while adjusting the position of the carriage.
Be careful! It is very important to follow this step otherwise the portal may not open inwhole or risk of wrong closing!
Perform the same operation for the second jack
in mm